Obras Mecánicas
PIGAP I y II: sistemas de inyección de gas
Alcance ejecutado
Three consecutive projects between 1996 and 2000: the PIGAP I and Carito Oeste high-pressure gas injection networks, and the balance of plant and island of eight GE / Nuovo Pignone compressors of PIGAP II (1,440 MMSCFD at 9,000 psig).
Pipe up to 65 mm thick for what was then the highest injection pressure in the world (15,000 lb): 12-hour welded joints with post-weld heat treatment, ultrasonic inspection and prefabrication of double joints at the Barcelona base. All three were delivered ahead of schedule.