
Obras Mecánicas
Gasoducto Gibraltar–Bucaramanga
Alcance ejecutado
Laying of 178 km of 12" pipeline to supply 42 million cubic feet of gas per day to the city of Bucaramanga. CONFURCA's first large-scale project outside Venezuela.
Route across the Andes, with near-vertical slopes between 900 and 3,400 m above sea level and work at very low temperatures, plus the crossing of the Bucaramanga metropolitan area. A landmark project in Colombia.


